Skip to main content

Apapa-Oshodi Expressway: Users lament slow repairs

Apapa-Oshodi Expressway: Users lament slow repairs

BTS MEDIA 
December 5,2018 

Some of the road users who spoke to The News Agency of Nigeria in separate interviews said that the Expressway had been cut off by gullies and trucks, noting that the rehabilitation work was slow.
Mr Solomon Nkemakolam, an Uber driver, said that craters compounded gridlock while vehicles were compelled to ply only the Oshodi bound carriageway as double lane because trucks had blocked the Apapa bound carriageway.
“Everywhere is blocked, it was tough crossing those pits with my car, that is why I am washing now’’ he said.
Malam Ado Dahiru, a businessman who deals in electronics between Lagos and some Northern cities, noted that the hardship on the road made movement difficult and almost impossible.
“Trucks have blocked the other lane, this lane is cut off because of the gullies, refuse has blocked the median, commercial motorcycles are maneuvering through every little available space.
“It is difficult to drive or walk on this road, we need all round quick government intervention here,’’ he said.
A car dealer, Mr Nna Gerald, stressed the need to fix the road on time “because we are going through hell on a daily basis and we are not making sales.’’
“Tankers are always falling here and it is affecting our business, people who want to buy cars cannot because there is no road to move it out.’’
Another car dealer, Mr Ogeri Charles, said he saw construction workers on the Oshodi-Apapa road last week, but that speeding repairs of the road became imperative.
“They are already working but the work is slow, a road like this requires very quick repairs because this road leads to the Apapa ports responsible for a lot of businesses in this nation,’’ Ogeri said.
NAN correspondents who took a trip on the road reports that the gullies have taken over the Trinity Bus Stop toward Berger (Under Bridge) while some vehicles were seen stuck in the craters in the course of navigating the depths covered with ponds on the Oshodi bound carriageway.
Responding, the Federal Controller of Works in Lagos state, Mr Adedamola Kuti, told NAN that a contract had been awarded for the reconstruction of the road.
Kuti explained that the road had been officially handed over to the contractor, adding that workers were on site, fixing bad portions on the road.
He promised that all the issues the stakeholders raised would be addressed very soon.
“We are going to make sure we make effective use of the dry season to repair a lot of our roads,’’ Kuti promised.

Comments

Popular posts from this blog

We won’t approve aviation ministry’s 2019 budget unless minister shows up —Reps committee

We won’t approve aviation ministry’s 2019 budget unless minister shows up —Reps committee BTS MEDIA  December 11,2018  The House of Representatives Committee on Aviation has threatened not to approve the 2019 budget of the Federal Ministry of Aviation and all its parastatals for the failure of the Minister and the heads of parastatals to appear before the committee. The chairman of the committee, Rep. Nkiru Onyejeocha (PDP-Abia), issued the threat on Tuesday at a meeting on the 2018 budget performance with the committee, which the Chief Executives did not attend, though they sent representatives. Onyejeocha said that the committee was not happy with the ministry and all its agencies for always making excuses not to interface with the committee. According to her, their excuses are either about one director-general who is not in the country or about the other that has traveled out. “We cannot ask questions and get a reply. The budget implementation is zero, to ...

Why We Removed Jimi Agbaje’s Billboard On Third Mainland Bridge – LASAA

Why We Removed Jimi Agbaje’s Billboard On Third Mainland Bridge – LASAA  BTS MEDIA  December 6,2018 Jimi Agbaje The Managing Director of Lagos State Signage and Advertisement Agency (LASAA), Mobolaji Sanusi, says the removal of the Peoples Democratic Party (PDP) candidate’s Jimi Agbaje posters on third mainland bridge is not politically motivated. According to him, some of the installations of the A-frame posters by the PDP candidate contravene the LASAA guidelines. LASAA boss said this on Wednesday during a security and stakeholders meeting with the Independent National Electoral Commission (INEC) and political parties summoned by the Lagos Commissioner of Police, Imohimi Edgal. He explained further that the agency has guidelines but many political candidates are flouting the rules. He recommended that politicians should play by the rules and make an...

Senate okays higher institutions for President’s hometown, nine others Published

Senate okays higher institutions for President’s hometown, nine other BTS MEDIA November 29,2018  The Senate on Wednesday approved the establishment of 10 new higher institutions across the country. The resolution was made after the federal lawmakers adopted the report of the Senate Committee on Tertiary Institutions and TETFund. The committee’s chairman, Jibrin Barau, presented the report for consideration. The 10 new higher institutions approved by the Senate include one polytechnic to be located in the hometown of President Muhammadu Buhari, Daura in Katsina State. The federal lawmakers agreed that the establishment of the institutions would open up the education space in the country. They also expressed the belief that the step would assist the country to fight illiteracy. The Senate also said that the approval of the establishment of the institutions was in line with the policy to establish polytechnics across the states. The approved institutions inclu...